Service 01 — ¥41,000
Scheduling that reflects how your organisation actually works
A ten-week engagement to set up automated scheduling around your real constraints — contractual hours, skill requirements, and individual preferences — with a parallel period so you can compare outputs before any handover.
Back to HomeWhat this engagement delivers
Scheduling that happens without occupying a manager for hours
Time returned
Scheduling that previously required several hours of a manager's week runs on its own, within the rules your organisation has agreed. That time goes elsewhere.
Documented constraints
Every rule the system applies — contractual, operational, or preferential — is written down before the build starts. You can inspect and verify each one.
Measured difference
Figures from your current scheduling practice are recorded at the start. At the end of the engagement, you receive a comparison showing what changed and by how much.
The situation this addresses
Scheduling that takes longer than it should
For many organisations, scheduling is a task that expands to fill whatever time is available. The constraints are real — legal hours, skill requirements across shifts, individual preferences, coverage minimums — and holding all of them in mind while building a roster takes considerable effort.
The result tends to be a process that works but that depends heavily on the person who understands the rules. When that person is unavailable, the process is harder for anyone stepping in. And the time it takes each cycle is not easily recovered elsewhere.
What tends to make it difficult
Constraint volume
A single schedule may need to satisfy dozens of rules simultaneously, some of which only a person familiar with your contracts and people would think to apply.
Fragile knowledge
Much of the logic that makes a good schedule lives with one or two people. It is rarely written down in a form that would survive their absence.
Repeated weekly cost
Unlike a one-off project, scheduling happens every cycle. The cost of a slow process accumulates across the year in a way that a single slow task does not.
The approach
Built around what your organisation actually requires
The engagement starts with the constraints, not the software. Before any system is built, we document every rule that a good schedule needs to satisfy — contractual hours, skill coverage by shift, individual preferences that are accommodated where possible, and any operational minimums that apply.
That document is yours to review and correct before we proceed. If a rule is missing or stated incorrectly, it is easier to fix at this stage than after the build is complete.
The system is then built against those documented constraints. It does not guess at what a good schedule looks like; it applies the rules the organisation has agreed on.
Boundary diagram
What the system handles and what remains with your team:
System handles
Applying documented constraints to produce draft schedules each cycle
Flagging conflicts or constraint violations before publication
Logging which rules were applied and which preferences were accommodated
Your team retains
Manual override at any point — the system can always be corrected
Final approval before the schedule is distributed
Decisions requiring judgement not captured in the documented constraints
How the ten weeks proceed
A parallel period before any handover
Weeks 1–2
Constraint documentation
We interview the people who currently produce schedules and record every rule they apply. The resulting document is reviewed and agreed before anything is built.
Weeks 3–5
System build
The scheduling system is built against the documented constraints, with testing against historical schedule data where available.
Weeks 6–9
Parallel period
The system runs alongside current practice. Your team continues producing schedules as normal while we compare both outputs each cycle.
Week 10
Handover and figures
You receive the working system, comparison figures, the constraints document, and a clear note on what continues to require manual review.
Investment
¥41,000
Fixed price for the full ten-week engagement. No additional charges for the constraint documentation, parallel period, or comparison figures.
If the engagement scope needs to change materially after the constraint document is agreed, we discuss that openly before proceeding — there are no surprises in the final account.
What is included
Constraints documented and agreed before build begins — you verify everything
Manual override retained throughout — your team can correct the system at any point
Parallel period of four weeks comparing system outputs to current practice
Comparison figures covering schedule quality and preparation time before and after
Working system and full documentation handed over at the end of week ten
How progress is measured
What the comparison figures cover
Preparation time
We record how long it takes to produce a schedule under current practice and measure the same figure during the parallel period. The difference is stated plainly.
Constraint compliance
We track how often the system-generated schedule satisfies the documented constraints compared to the manually produced one. Where deviations occur, we note the reason.
Override rate
We record how often your team uses the manual override and what category of decision prompted it. This helps identify constraints that were not fully captured and may need refining.
Results vary depending on how scheduling currently works in your organisation, the complexity of the constraint set, and how consistently the rules are applied at present. The comparison figures reflect your specific situation, not an industry average. Timelines may shift if the constraint documentation phase reveals a scope significantly larger than initially indicated.
Our commitment
If the system does not perform as documented
The system is built against a constraint document you have reviewed and approved. If, during the parallel period, it produces schedules that violate those agreed constraints, we identify the cause and correct it before the engagement ends — at no additional cost.
The parallel period exists specifically so that any such issues surface while your current process is still running. You are not asked to rely on the system before you have had the opportunity to compare it.
Initial conversation
We are glad to have a preliminary conversation about your scheduling situation before any commitment is made. The purpose of that conversation is to understand whether your scheduling task falls within the scope of this service.
If it does not — if the constraints are unusually complex, or if the task differs materially from what we have described — we will say so clearly, and there is no obligation to proceed.
Arrange a conversationGetting started
What happens after you get in touch
Step 1
You send a note
A brief description of your scheduling situation — who is involved, roughly how long it takes, and what constraints you know about.
Step 2
We respond within two days
An initial response indicating whether the task sounds appropriate and, if so, a suggested time for a short call.
Step 3
Scope is confirmed
A brief written statement of what the engagement will cover and when it will begin. No obligation until this document is agreed.
Step 4
Engagement begins
Constraint documentation starts in week one. Everything proceeds from the agreed scope document.
Scheduling System Implementation — ¥41,000
If scheduling takes more time than it should
We are happy to discuss whether this service fits your situation. The initial conversation carries no obligation and no cost.
Get in touchOther services
Other areas we work in
Service 02 — ¥32,000
Translation Workflow Integration
Assisted translation for recurring business documents between Japanese and other languages, with a maintained terminology base and a defined human review stage. Seven weeks.
View serviceService 03 — ¥29,000
Back-Office Task Review
A department-level census of recurring administrative tasks — frequency, duration, variability, and the judgement each requires — producing a proportionate picture of what automation could and could not affect. Four weeks.
View service